Inauguration of the Kering’s New Trecate (NO) Global Logistics Hub
Kering has announced the completion of the first phase of its new global logistics, a location in which METALSISTEM has played a central role.
Kering has announced the completion of the first phase of its new global logistics, a location in which METALSISTEM has played a central role.
METALSISTEM is proud to publish an extract from the “Costruzioni Metalliche” magazine, an important construction engineering Italian periodical. This article discusses the test tower currently used by the METALSISTEM R&D team for full scale pallet rack seismic testing.
METALSISTEM has developed new solutions for its homeware shopfitting range. The store presented in the pictures showcases a wide variety of solutions for the display of cutlery, flatware, linen and many other accessories.
METALSISTEM publishes today some pictures of a unique Mobibasic reference installation. The Mobibasic mobile bases installation features four blocks of eight trollies each for a total of 32 double side mobile bases.
METALSISTEM publishes a recent Super 6 pallet racking reference installation. This Super 6 system features bays containing 9 beam levels and with picking corridors.
METALSISTEM is happy to publish some pictures of a recent mezzanine system.