20
MARCH 2015
METALSISTEM is happy to publish some pictures of a recent mezzanine system.
The installation features a Super 3 two-tier system coupled with a Super 6 mezzanine with some noteworthy details and accessories. This installation has been designed to stock drilling equipment; hence, the need to fit the mezzanines with doors to a pilferable area.
The installation maximises efficiency by creatively adopting standard METALSISTEM product and solutions, seamlessly melting the installation into the existing building.
The clients’ small-part needs were catered to by the dedicated Super 3 two-tier in order to provide the final customer with a perfectly balanced outcome among small parts, bulk items and serviceable areas. The addition of doors and specific accessories gives the final touch to this state-of-the-art installation.
Other News
METALSISTEM projects & activities
SIDAC Euroscacco shelving – a protagonist in the “Interim Measure” project, held at the Santa Chiara theatre of Trento
A Supermarket goes to the theatre. The artist, Anna Scalfi Eghenter, created this art installation placing SIDAC Euroscacco shelving centre stage at the Santa Chiara Theatre of Trento.
Inauguration of the Kering’s New Trecate (NO) Global Logistics Hub
Kering has announced the completion of the first phase of its new global logistics, a location in which METALSISTEM has played a central role.
SIDAC Reference Istallation: Supermarket & Electronics Stores
METALSISTEM presents some pictures of three new electronics stores delivered in November together with a remarkable Hypermarket store.