14

MARCH 2014

We are proud to publish some pictures of a recent installation achieved in Italy. The installation comprises Unibuild and Unirack material for a total of 14,200 pallet places and 10,000 m2 of Unirack shelving used for warehousing hardware.

The area where the installation has been delivered is considered to be seismic and therefore the system has been designed following current international standards.

The whole system has been produced and assembled in only 30 days meeting the targets with maximum customer satisfaction.

Download

Other News

METALSISTEM projects & activities

SAVE THE DATE: 16th September 2019

SAVE THE DATE: 16th September 2019

Theoretical seminar – “Use of experimentation in support of structural design – theory and applications”– National Engineering Register of Italy accredited course. Attendees are eligible for 6 ECTS credits.

read more